Drilling And Well Completion Technology Articles
|
|
Completion System Designed To Monitor Frac Operation
By Baker Hughes
A well located in the Bakken shale had a vertical cased section of 10,000 ft. (3,048 m) and a 10,000 ft. openhole horizontal section. The completion consisted of 10 stages; five of the stages were monitored using PT gauges. The operator wanted to monitor separate frac events in multiple zones and to continue monitoring the zones during production.
|
|
|
MWD Systems For Perenco
By GE Energy
Perenco wanted to control the cost of drilling and the availability of tools by purchasing and implementing its own internal directional drilling services. These services could be used to develop new, more remote oil reserves that were previously unreachable by vertical wells.
|
|
|
|
|
|
Drilling And Well Completion Technology Downloads
|
| Brochure: Completion Systems |
| The value that customers experience by working with FMC is just as important as the equipment and services that we provide. FMC's broad service network, capital investment in equipment, and field expertise ensures constant customer responsiveness.
|
|
| Brochure: Oilfield Solutions |
| A major problem in the drilling, completion, and production phases of the oil and gas industry is the reliable performance of pressure activation devices. Fike has addressed this and other oilfield problems through the application of its experience in rupture disc technology.
|
|
| Top Drive Of The Future |
| A handful of untrained technicians approached the newly developed MH MDDM 1000 AC™ with a list of repair and replacement jobs. The list had resulted from study of millions of hours of top drive operations; these were the most common jobs.
|
| Browse the download library |
|
|
|