Application Note
Lessons Learned With A Partial LPFW Re-Sleeving - Ameren
This paper references slide 12 of the slide presentation for explaining further the Ameren "5%-Rule" expected remaining service life criteria evaluation for the AmerenUE Labadie unit 4, 5A LP feedwater heater.
A practical industry operating record criteria is proposed as a general guideline as to when to plan scheduling the re-sleeving of cuprous alloy tubed feedwater heaters, both high-pressure and low-pressure.
With longer time spans between major generating unit outages to plan a re-bundling, time-to-failure for a heat exchanger with advanced pluggage may not time well with those opportunities. So a predictive tube-failure rate model of remaining service life becomes invaluable; for instance, as to when to take a Spring mini-outage for interim measures such as a low-cost re-sleeving to avert larger losses. In the case of the Labadie 4-5A LPFWH, an avoided additional -16mw de-rate which otherwise may have occurred by Sept. 16, 2009. The 4-5A's re-sleeving decision was enacted by March of 2009, and in-service by June of 2009. Sleeve delivery was about 8 weeks.
The content you requested is only available to registered users of Oil and Gas Online. By registering now, you'll get exclusive access to this piece of content and thousands of addtional articles and product reviews across our entire network of sites.



