ICP’s Ochoa Mine Project is projected to produce approximately 714,000 tons per year of SOP (K2SO4) from polyhalite ore for greater than fifty years as concluded in a feasibility study.
Another part of the feasibility study was the demonstration of a unique process, based on research that dated back nearly a century, to produce SOP economically while maintaining a high-quality, specialty fertilizer product.
ICP selected Veolia Water Technologies to refine the process due to their experience in the industry and overall development capabilities for crystallization process design using HPD® Technology. A series of tests were conducted to simulate various stages of the proposed flowsheet with the goal of validating the overall design.