Downloads


Case History: No. U3110 Winnetka Electric Plant

To access this content, Register or Sign In.
Description

PROBLEM: Severe full-length problems from both pitting and also ammonia grooving. The problem is compounded by a total lack of access to the condenser because of a recently installed Caterpillar Diesel Generator located only feet from the tubesheet.

To access this content, Register or Sign In.

Register Today. It's Fast And Free.

The content you requested is only available to registered users of Oil and Gas Online. By registering now, you'll get access to this piece of content and thousands of additional articles and product reviews across our entire network of sites.

Already Registered? Sign In.

Forgot your password?


CTI Industries

More From CTI Industries

Please wait... busy