Static Bottom-hole Pressure Calculation
Source: Hamdon Wellsite Solutions Ltd.
The purpose of this survey is to determine the bottom-hole pressure of a well that has been shut-in or suspended for a prolonged period of time
The purpose of this survey is to determine the bottom-hole pressure of a well that has been shut-in or suspended for a prolonged period of time. A fluid level is taken to determine the amount of fluid above the mid-point perforations or datum depth and then using some basic well information (recent production history, producing fluid level (if known), fluid and gas gravity's, temperatures), the static bottom-hole pressure can be calculated.
Hamdon Wellsite Solutions Ltd., 523 Reid Close, Edmonton, AB T6R 2M3. Tel: 780-448-0074; Fax: 780-444-0768.
This website uses cookies to ensure you get the best experience on our website. Learn more