Time Saver Wellhead Flex System
Source: Cameron
The TSW Flex system is a quick make up system that is designed to excel in installation, operation and flexibility over existing products in the market.
The TSW Flex system is a quick make up system that is designed to excel in installation, operation and flexibility over existing products in the market. It is ideal for low to moderate pressure gas wells that require high pressure fracturing and can be easily converted to artificial lift.
Design Features and Benefits
- Versatility: The Time Saving Wellhead System is extremely versatile offering fast makeup and fracing capabilities.
- Ease of Operating: Allows fracing through the tubing spool without any isolation device.
- Full Bore Access: Full opening to 4-1/2” and 5-1/2” casing for frac potential.
- Time Savings: Ready for frac and flowback operations and allows for easy conversion to artificial lift applications.
- Height Savings: The compact design allows installation where space is an issue.
- Safety: Fewer personnel required and minimized time spent working under suspended loads in a confined area.
- Safety: Eliminates crane, excess equipment and on-site service technicians required to run bore isolation tools.
- Dual barrier system
This website uses cookies to ensure you get the best experience on our website. Learn more