White Rose FPSO topsides tender moves to final phase
Maersk Contractors Newfoundland Limited was awarded the Front-End Engineering Design (FEED) contract for the FPSO in October 2000 by the project owners. Maersk has reduced the number of bidders for the topsides work to two.
Aker Maritime Kiewit Contractors (AMKC) has been advised to refine the costs of a topsides fabrication and integration lump-sum bid. This work is expected to take until Q3 2001.
Single Buoy Moorings (SBM), which has provided a lump-sum bid for topsides fabrication and integration, will also participate in the final tender phase, holding open its bid until October 1, 2001.
"The final tender phase will involve thorough engineering and costing to define lump-sum costs for internationally competitive topsides," noted Will Roach, Husky's General Manager of East Coast Development. "Moreover, the first phase of the topsides bidding was encouraging in terms of the potential to meet target project costs on a fixed-price basis."
The White Rose oilfield is located 350 km east of Newfoundland. Recoverable reserves for the South Avalon pool of the oilfield are estimated at 230 million bbl. Husky filed the development application for the White Rose oilfield with the CNOPB in January 2OOl. In March, the Board forwarded the documents to a public review commissioner to begin the formal public review.
Husky Oil Operations Limited is a wholly owned subsidiary of Husky Energy Inc., a Canadian-based integrated energy and energy-related company headquartered in Calgary, Alberta.
Source: Husky Energy